Socket Octal, 7/8", long leads
Socket Octal, 7/8", long leads
Socket Octal, 7/8", long leads
Socket Octal, 7/8", long leads
Preview: Socket Octal, 7/8", long leads
Preview: Socket Octal, 7/8", long leads
Preview: Socket Octal, 7/8", long leads
Preview: Socket Octal, 7/8", long leads
Socket Octal, 7/8", long leads
Mobile Preview: Socket Octal, 7/8", long leads
Mobile Preview: Socket Octal, 7/8", long leads
Mobile Preview: Socket Octal, 7/8", long leads
Mobile Preview: Socket Octal, 7/8", long leads

Socket Octal, 7/8", long leads

Product No.:
sk18
<font color=green><b>In stock for immediate delivery.</b></font> </br>Delivery time depends on the destination country* In stock for immediate delivery.
Delivery time depends on the destination country* 
RoHs:
conform
Weight:
0.02 kg per piece
1,95 €

incl. tax excl. Shipping costs

Needed for:

Psvane 6SN7GT / 6SN7
Psvane 6SN7GT
Drop in replacement for 6N8P 6H8C 6SN7 CV181
24,80 €

Tung-Sol 6SN7 Reissue

Super linearity, low noise, and full performance ratings make this one of the best 6SN7 tubes ever made. The sound signature is on par with 5692 types. Excellent driver tube in high-end audio applications.

46,90 €

Customers who bought this product bought also the following products:

F+T 22 µF @ 450 Volt, axial
  • Type: Aluminum Electrolytic Capacitors
  • Capacitance: 22 µF
  • Voltage Rating: 450 V
  • Tolerance: +/- 20%
  • Operating Temperature Range: - 40°C / + 85 °C
  • Dimensions: Ø 16 mm x 30 mm
  • Termination Style: axial
2,20 €

F+T 47 µF @ 500 Volt, axial
  • Type: Aluminum Electrolytic Capacitors
  • Capacitance: 47 µF
  • Voltage Rating: 500 V
  • Tolerance: +/- 20%
  • Operating Temperature Range: - 40°C / + 85 °C
  • Dimensions: Ø 21 mm x 37 mm
  • Termination Style: axial
4,95 €

JJ 6L6 Red Label - QUAD
4 Tubes matched as quad
The JJ 6L6 is very popular because of its warm sound.
115,80 €
28,95 € per Piece

Resistor Metaloxide 2 Watts / 100 Ohms
Resistor Metaloxide 2 Watts
  • +/- 5% tolerance
  • -55° C to 240° C operating range
  • Max 500 V
  • Excellent flame retardant coating
  • Different manufacturers
Please note:
These resistors have a very small form factor:
red: l = 10 mm, d = 3.9 mm
green: l = 11.5 mm, d = 4.5 mm
0,20 €

EH 7025 (12AX7 / ECC83 HQ)
The Electro-Harmonix 7025EH has a mid-range that gives clarity and definition to the sound and a smooth top end for warmth and balance. With these characteristics, along with the exceptionally low noise and low microphonics, the Electro-Harmonix 7025EH will work equally well in vintage and modern high-gain guitar amplifiers, as well as sensitive phono preamps.
21,80 €

Fuse 2 A fast blow
  • Rated Voltage: 250 VAC
  • Contact caps: nickel-plated brass
  • Size: Ø 5 mm x 20 mm
0,25 €