Belton Octal Socket VT8-PT, long leads
Belton Octal Socket VT8-PT, long leads
Preview: Belton Octal Socket VT8-PT, long leads
Preview: Belton Octal Socket VT8-PT, long leads
Belton Octal Socket VT8-PT, long leads
Mobile Preview: Belton Octal Socket VT8-PT, long leads
Mobile Preview: Belton Octal Socket VT8-PT, long leads

Belton Octal Socket VT8-PT, long leads

Product No.:
sk24
<font color=green><b>In stock for immediate delivery.</b></font> </br>Delivery time depends on the destination country* In stock for immediate delivery.
Delivery time depends on the destination country* 
RoHs:
conform
Weight:
0.02 kg per piece
2,45 €

incl. tax excl. Shipping costs

Customers who bought this product bought also the following products:

Tung-Sol 5751

Premium medium-Mu Twin Triode for use in preamplifier.

29,95 €

JJ 12AX7 / ECC83S V1

TT Selection: V1 - Low Noise
This tube is selected for sensitive input stages (V1)

Sweet and warm sounding preamp tube with high gain.

21,90 €

Sylvania 5814A / 12AU7 USA NOS
Sylvania 5814A, NOS, Boxed
Made in USA
33,91 €

Sylvania 12AT7 / ECC81 NOS

Sylvania 12AT7, NOS

  • Made in USA
  • Limited Stock
  • Well balanced sound with lots of details
19,85 €

JJ ECC832 / 12DW7
COMBINATED DOUBLE TRIODE
ECC832 is 12DW7 pre-amplifying double triode. It combines 12AX7 and 12AU7, where the 12AX7 is used as 1st stage and the 12AU7 as 2nd stage.
19,90 €

Tung-Sol 12AX7 / ECC83 Reissue V1

TT Selection: V1 - Low Noise
This tube is selected for sensitive input stages (V1)

The Ultimate 12AX7. Big, warm, and musical. High Gain, ultra-low microphonics, and superb linearity with a dynamic 3-D sound.

28,50 €

GE 5814A / 12AU7 NOS JAN USA

GE 5814A / 12AU7 NOS

  • Limited Stock
  • Made in USA
  • JAN
22,95 €

Tung-Sol 6L6 STR Reissue - PAIR
2 tubes, matched as pair

Premium power beam tetrode continuing in the Tung-Sol legacy. The ultimate in musical tone and smooth overdrive, STR delivers the sound that established Tung-Sol as the benchmark of quality.
Faithful re-issue of the original Tung-Sol STR, built to the same “Special Tube Request” specs of amp manufacturers of the 60s.
69,60 €
34,80 € per Piece

EH 12AX7 / ECC83 V1

TT Selection: V1 - Low Noise
This tube is selected for sensitive input stages (V1)

  • The 12AX7EH provides high gain with ultra low noise and detailed, musical tone that rivals the most desirable NOS types.
28,20 €

JJ EL84 / 6BQ5 Red Label - PAIR
2 tubes, matched as pair

JJ EL84 / 6BQ5 Red Label
33,50 €
16,75 € per Piece

JJ EL34 Version II - PAIR
2 tubes, matched as pair

EL34 II has fuller low mids and low end but does not lose headroom in the high end. Stronger than regular JJ EL34 but not as aggressive as the JJ E34L.
48,00 €
24,00 € per Piece