Belton Octal Socket VT8-PT, long leads
Belton Octal Socket VT8-PT, long leads
Preview: Belton Octal Socket VT8-PT, long leads
Preview: Belton Octal Socket VT8-PT, long leads
Belton Octal Socket VT8-PT, long leads
Mobile Preview: Belton Octal Socket VT8-PT, long leads
Mobile Preview: Belton Octal Socket VT8-PT, long leads

Belton Octal Socket VT8-PT, long leads

Product No.:
sk24
<font color=green><b>In stock for immediate delivery.</b></font> </br>Delivery time depends on the destination country* In stock for immediate delivery.
Delivery time depends on the destination country* 
RoHs:
conform
Weight:
0.02 kg per piece
2,45 €

incl. tax excl. Shipping costs

Customers who bought this product bought also the following products:

Heat shrink tube, set of 100, multicolored
  • Mixed sizes and colors, length 10 cm / ea
  • In plastic box
1,70 €

Tung-Sol 5751

Premium medium-Mu Twin Triode for use in preamplifier.

29,95 €

JJ 12AX7 / ECC83S V1

TT Selection: V1 - Low Noise
This tube is selected for sensitive input stages (V1)

Sweet and warm sounding preamp tube with high gain.

21,90 €

Sylvania 5814A / 12AU7 USA NOS
Sylvania 5814A, NOS, Boxed
Military version of the 12AU7 / ECC82, designed for increased reliability and performance, with lower microphony and noise levels.
  • NOS
  • Made in USA
  • High Grade 12AU7 / ECC82
33,91 €

Sylvania 12AT7 / ECC81 NOS

Sylvania 12AT7, NOS

  • Made in USA
  • Limited Stock
  • Well balanced sound with lots of details
19,85 €

JJ ECC832 / 12DW7
COMBINATED DOUBLE TRIODE
ECC832 is 12DW7 pre-amplifying double triode. It combines 12AX7 and 12AU7, where the 12AX7 is used as 1st stage and the 12AU7 as 2nd stage.
19,90 €

Tung-Sol 12AX7 / ECC83 Reissue V1

TT Selection: V1 - Low Noise
This tube is selected for sensitive input stages (V1)

The Ultimate 12AX7. Big, warm, and musical. High Gain, ultra-low microphonics, and superb linearity with a dynamic 3-D sound.

28,50 €

GE 5814A / 12AU7 NOS JAN USA

GE 5814A / 12AU7 NOS
Military version of the 12AU7 / ECC82, designed for increased reliability and performance, with lower microphony and noise levels.

  • HQ 12AU7 / ECC82
  • Made in USA
  • JAN
30,90 €

Tung-Sol 6L6 STR Reissue - PAIR
2 tubes, matched as pair

Premium power beam tetrode continuing in the Tung-Sol legacy. The ultimate in musical tone and smooth overdrive, STR delivers the sound that established Tung-Sol as the benchmark of quality.
Faithful re-issue of the original Tung-Sol STR, built to the same “Special Tube Request” specs of amp manufacturers of the 60s.
69,60 €
34,80 € per Piece